OPTIMALISASI PELAKSANAAN PROYEK DENGAN METODE EVALUASI DAN REVIEW PROYEK (PERT) DAN CRITICAL PATH METHOD (CPM) “Studi Kasus pada Proyek Renovasi Gedung Kantor Badan Penyelenggara Jaminan Sosial (BPJS) Ketenagakerjaan Cabang Sulawesi Tengah”

Syahruni Syahruni, Risnawati Risnawati

Sari


The project is an activity which has a period of time in the process of completion a project undertaken with careful planning so that the project can be completed with in the time specified. Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM) is a method for optimizing the implementation of the project so it can be known the time and cost of project completion. In this thesis purpose to analyzing the optimal target time of the project implementation agency renovation office building Institution of Social Security employment. And analyzing the total cost of the project office renovation Institution of Social Security employment based on the optimal time target

Kata Kunci


PERT method, CPM method , acceleration , networks , critical path

Teks Lengkap:

PDF

Referensi


Departemen Agama RI. Al-Qur’an dan Terjemahnya. Depok: Pustaka Alfatih, 2009.

Dimyati, Tjutju Tarliah dan Ahmad Dimyati. Operations Research Model-model Pengambilan Keputusan. Bandung: Sinar Baru Algensindo, 2006.

Dipohusodo, Istimawan. Manajemen Proyek dan Konstruksi Jilid 1. Yogyakarta: Kanisius, 2004.

Gray, Clive. Dkk. Pengantar Evaluasi Proyek Edisi Kedua. Jakarta: Gramedia Pustaka, 2007.

Hillier, Frederick S. dan Gerald J. Lieberman. Introduction To Operation Research Eighth Edition. Terj. Parama Kartika Dewa, dkk.,Operations Research-Penelitian Operasional. Yogyakarta: Andi, 2008.

HM, Jogiyanto. Analisis dan Desain Sistem Informasi Pendekatan Terstruktur, Teori Dan Praktik Aplikasi Bisnis. Yogyakarta: Andi. 2005.

Mahanavami, Gusti Ayu. “Perencanaan Waktu Pelaksanaan Proyek dengan Metode PERT”, Jurnal. http://stimid enpasarjur nal.com/pho cadownload/ 2008_1/gusti% 20ayu%20 mahan avam i_perencanaan% 20wakt u%20pelaksana an%20 proyek%20%20denga n%20 metode%20 pert _studikasus%20graha %20miracle %20denpasar.pdf (17 Mei 2014).

Prawirosentono, Suyadi. Riset Operasi dan Ekonofisika (Operations Research and Econophysics). Jakarta: Bumi Aksara, 2005.

Ridho, Muhammad Rizki dan Syahrizal. “Evaluasi Penjadwalan Waktu dan Biaya Proyek dengan Metode PERT dan CPM”, Jurnal. http://jurnal.usu.ac.id/index.php/jts/ article/view/6294/2659 (17 Mei 2014).

Siagian, P. Penelitian Operasional Teori dan Praktek. Jakarta: UI-Press, 1987.

Siswanto. Operation Research Jilid 2. Jakarta: Erlangga., 2007

Wijaya, Andi. Pengantar Riset Operasi (Tujuan, Pengertian dan langkah-langkah pengerjaan, contoh serta latihan soal). Jakarata: Mitra Wacana Media, 2011.

Yana, A.A. Gde Agung. “Pengaruh jam Kerja Lembur Terhadap Biaya Percepatan Proyek dengan Time Cost Trade Off Analysis.” Jurnal Ilmiah Teknik Sipil, Vol. 10 no. 2 (Juli2006).http://ojs.unud.ac.id/index.php/jits/article/view/ 3437/2471 (Diakses 17 Mei 2014)


Refbacks

  • Saat ini tidak ada refbacks.