FINANCIAL FEASIBILITY STUDY OF ROAD INFRASTRUCTURE DEVELOPMENT IN THE REGENCIES OF WAY KANAN, TULANG BAWANG BARAT, AND NORTH LAMPUNG

Authors

  • Verlina Agustine Institut Teknologi Sumatera
  • Shahnaz Nabila Fuady Institut Teknologi Sumatera
  • Goldie Melinda Wijayanti Institut Teknologi Sumatera
  • Adinda Sekar Tanjung Institut Teknologi Sumatera
  • Valendya Rilansari Institut Teknologi Sumatera

DOI:

https://doi.org/10.24252/jpm.v14i1.45823

Keywords:

Road, Agriculture and Plantation Sector, Financial Feasibility

Abstract

Roads play an important role in achieving national development goals, particularly in ensuring equitable development across regions with potential for growth at both regional and national levels. Lampung Province serves as the gateway to Sumatra Island, connecting various other provinces on the island to Java. The province is actively developing its regional potential, especially in the agriculture and plantation sectors. A large portion of these promising sectors, particularly in agriculture and plantations, is concentrated in three regencies: Way Kanan, Tulang Bawang Barat, and North Lampung. To support the development plans of these highly potential regions, the Lampung Provincial Government plans to improve and upgrade road infrastructure in order to boost economic development. This study identifies the financial feasibility of improving and upgrading provincial road infrastructure in Way Kanan, Tulang Bawang Barat, and North Lampung Regencies by using spatial analysis and quantitative analysis of financial feasibility criteria, including calculations of Net Present Value (NPV), Internal Rate of Return (IRR), Profitability Index (PI), and Payback Period. Based on the analysis, the most feasible alternative road route for development is the Simpang Tulung Randu – Adijaya – Tajab – Sp. Soponyono – Serupa Indah – Negara Ratu – Kotabumi and Serupa Indah – Bumiharjo – Sp. Way Tuba section. Road 1 has the highest IRR at 7.92%, the highest NPV at IDR 614,905,153,799, the highest PI at 2.30, and the fastest Payback Period of 13 years, 9 months, and 11 days.

Downloads

Download data is not yet available.

References

Healey, P. (2004). The Treatment of Space and Place in the New Strategic Spatial Planning in Europe. International Journal of Urban and Regional Research, 28(1), 45–67. https://doi.org/https://doi.org/10.1111/j.0309-1317.2004.00502

Hoegl, M., & Gemuenden, H. G. (2001). Teamwork quality and the success of innovative projects: A theoretical concept and empirical evidence. In Organization Science (Vol. 12, Issue 4, pp. 435–449). Institute for Operations Research & the Management Sciences (INFORMS). https://doi.org/10.1287/orsc.12.4.435.10635

Holden, M. (2008). Social learning in planning: Seattle’s sustainable development codebooks. Progress in Planning, 69(1), 1–40. https://doi.org/10.1016/J.PROGRESS.2007.12.001

Hutagalung, S. S., & Hermawan, D. (2018). Membangun Inovasi Pemerintah Daerah. Deepublish, 1–215. http://repository.lppm.unila.ac.id

Mukhlish, M. B. (2018). Jurnal Administrasi Bisnis Terapan DALAM MENINGKATKAN INOVASI DAN KESEJAHTERAAN Jurnal Administrasi Bisnis Terapan. Jurnal Administrasi Bisnis Terapan, 1(No.1), 31–43.

Pearce II, John A. & Richard B. Robinson Jr. (2000). Formulation, Implementation, & Control of Competitive Strategy, 7 th ed. New York: McGraw-Hill.

Published

2025-05-26

How to Cite

Verlina Agustine, Fuady, S. N., Wijayanti, G. M., Tanjung, A. S., & Rilansari, V. (2025). FINANCIAL FEASIBILITY STUDY OF ROAD INFRASTRUCTURE DEVELOPMENT IN THE REGENCIES OF WAY KANAN, TULANG BAWANG BARAT, AND NORTH LAMPUNG. Plano Madani : Jurnal Perencanaan Wilayah Dan Kota, 14(1), 1–15. https://doi.org/10.24252/jpm.v14i1.45823

Issue

Section

ARTICLES